Prototype #2 Construction

Construction on the second prototype is underway. the first prototype used poured concrete piers to support the post frame so the entire house was above ground. We have now adapted the design to have a basement! The basement will be made from precast concrete panels. Here we have the first step in the process which is of course to dig a hole for the foundation to fit. Then the drainage pipes are put in.

Next step is to set the concrete panels into place making sure that everything is square and level. Then the concrete is poured to form the basement floor. Here is the man himself with the help of Mark and David making it all happen.

So far so good! Next, the first floor deck is constructed and the basement is back filled. From here the design diverges slightly again from the first prototype. On the last prototype the walls were assembled, for the most part, directly on site from the base up. This time around the walls were almost completely assembled separately on the ground. No scaffolding required! We then lifted entire walls and set them into place using a forklift. However, getting them to fit snugly together did take some coxing... with a chainsaw and a sledgehammer. Take a look!

We'll keep you updated on construction as it progresses! Until then, all the best.